East Sheen

East Sheen Project

2 Bedroom ground floor period appartment built in 1890’s

Introduction

This project was introduced by referral.

Scope

Ground floor kitchen and bathroom extension.

Our works included electrics, hard landscaping, lighting, plumbing, tiling, flooring, structural works, brickwork, roofing, design fabrication and installation of all bathroom cabinetry and all finishing.

Time scale

3 months 2 weeks